0
Äðóãèå çàïèñè çà ýòî ÷èñëî:
2026/03/02 - Natan
2026/03/02_1 - Natan2
2026/03/02_2 - Natan3
<< ïðåäûäóùàÿ çàìåòêàñëåäóþùàÿ çàìåòêà >>
02 ìàðòà 2026
Natan4

Dima, I’ll answer you calmly and realistically.

If **all flights from Israel are currently cancelled**, then this is an airspace/security closure issue — not an airline issue.

When that happens:

• Airlines may keep flights visible in booking systems
• Aggregators like Kiwi.com often still show tickets
• But the flights will later be cancelled

Why?

Because aggregators do not control real-time airspace permissions.
They sell based on schedule data, not security clearance.

So yes — it is completely normal (and frustrating) that you can “book” a flight that won’t operate.

---

## Can he monitor when flights reopen?

Yes — but not via Kiwi.

Monitor directly:

• El Al
• Arkia
• Israir
• Aegean Airlines

And especially departures board at
Ben Gurion Airport

Airlines update first. Aggregators update last.

---

## About the deadline 15.03

Important question:

Why must he return before 15.03?

• Visa expiration?
• University requirement?
• Military obligation in Poland?
• Insurance issue?

If it is administrative — war is a force majeure situation.
Most institutions accept official proof of cancelled flights.

He should collect:

• Cancellation confirmations
• Screenshots of airport closure
• Airline emails

This protects him legally.

---

## If airspace remains closed

Plan B is land exit:

### Option 1: Jordan → Amman → Europe

### Option 2: Egypt → Cairo → Europe

But this must only be done once borders are confirmed open same-day.

---

## Realistic timeline logic

In previous escalations:

• Full shutdowns rarely last very long
• Limited humanitarian / short-haul corridors reopen first
• Cyprus and Greece reopen before long-haul

So Larnaca/Athens corridor is most likely first reopening.

---

## Very important

Do NOT book via Kiwi now.

Book only:

• Directly with airline
• Refundable ticket
• After confirmation that flights are actually departing

---

Dima, tell me:

Is he physically safe right now?
And what is the reason for the 15.03 deadline?

Then I’ll calculate whether waiting is realistic or if land exit planning should start immediately.

<< ïðåäûäóùàÿ çàìåòêà ñëåäóþùàÿ çàìåòêà >>
Îñòàâèòü êîììåíòàðèé